Real Options for Project Schedules (ROPS)

Lester Ingber

Lester Ingber update to 2007-05-23

https://arxiv.org/abs/0704.0090
Real Options for Project Schedules (ROPS) has three recursivesampling/optimization shells. An outer Adaptive Simulated Annealing (ASA)optimization shell optimizes parameters of strategic Plans containing multipleProjects containing ordered Tasks. A middle shell samples probabilitydistributions of durations of Tasks. An inner shell samples probabilitydistributions of costs of Tasks. PATHTREE is used to develop options onschedules.. Algorithms used for Trading in Risk Dimensions (TRD) are applied todevelop a relative risk analysis among projects.

journal: None

category: cs.CE cond-mat.stat-mech cs.MS cs.NA physics.data-an

项目进度的实物期权 (ROPS)

Lester Ingber

Lester Ingber update to 2007-05-23

https://arxiv.org/abs/0704.0090
Real Options for Project Schedules (ROPS) 具有三个递归采样/优化壳。外部自适应模拟退火 (ASA) 优化外壳优化包含多个包含有序任务的项目的战略计划的参数。中间壳对任务持续时间的概率分布进行采样。内壳对任务成本的概率分布进行采样。 PATHTREE 用于开发计划中的选项。用于风险维度交易 (TRD) 的算法用于开发项目之间的相对风险分析。

期刊参考: None

category: cs.CE cond-mat.stat-mech cs.MS cs.NA physics.data-an